Global Data Center Construction Market Size, Status and Forecast 2020-2026

Global Data Center Construction Market Size, Status and Forecast 2020-2026

Apr 2020 QYResearch ICT93 Pages Price :
$ 3900
A data center is a facility used to house computer systems and associated components, such as telecommunications and storage systems. It generally includes redundant or backup power supplies, redundant data communications connections, environmental controls (e.g., air conditioning, fire suppression) and various security devices. Large data centers are industrial scale operations using as much electricity as a small town.

Data center construction is the collective set of processes used to physically construct a data center facility. It combines construction standards data center operational environment requirements.

Data center construction primarily focuses on designing and building a data center using these key factors:

Capacity: The floorplan of the data center must have enough room to house all servers and equipment for current and perceived future use.

Disaster Tolerant: The data center facility must be able to resist natural disasters and calamities such as earthquakes, floods, snowstorms, tornados, etc. Moreover, the data center construction also looks for ways to prevent disasters, such as adequate water tanks and hoses within the facility for putting out a fire.

Efficient Design: The overall design should be straightforward and require minimal wiring. With the shift towards green data centers, efficient air flow, renewable energy resources and other environmental factors are also taken into consideration.
A data center is used to house an enterprise IT infrastructure. They constitute the backbone of essential business operations. The demand for cloud-based services is increasing among enterprises including many Fortune 500 companies. Several industries are making use of advanced technologies to gain a competitive advantage. The complexities associated with business applications have increased because of the enormous growth in data volumes. This has triggered a greater need for construction and renovation of data centers. Enterprises are focusing on constructing green data centers to reduce power consumption and environmental impact. The construction of a data center includes design, architecture, installation of electrical and mechanical systems, and incorporation of security mechanisms. Infrastructure certifications also play a vital role in the building of data center facilities.
Since the COVID-19 virus outbreak in December 2019, the disease has spread to almost 100 countries around the globe with the World Health Organization declaring it a public health emergency. The global impacts of the coronavirus disease 2019 (COVID-19) are already starting to be felt, and will significantly affect the Data Center Construction market in 2020.
COVID-19 can affect the global economy in three main ways: by directly affecting production and demand, by creating supply chain and market disruption, and by its financial impact on firms and financial markets.
The outbreak of COVID-19 has brought effects on many aspects, like flight cancellations; travel bans and quarantines; restaurants closed; all indoor events restricted; over forty countries state of emergency declared; massive slowing of the supply chain; stock market volatility; falling business confidence, growing panic among the population, and uncertainty about future.
This report also analyses the impact of Coronavirus COVID-19 on the Data Center Construction industry.
Based on our recent survey, we have several different scenarios about the Data Center Construction YoY growth rate for 2020. The probable scenario is expected to grow by a xx% in 2020 and the revenue will be xx in 2020 from US$ 23130 million in 2019. The market size of Data Center Construction will reach xx in 2026, with a CAGR of xx% from 2020 to 2026.
With industry-standard accuracy in analysis and high data integrity, the report makes a brilliant attempt to unveil key opportunities available in the global Data Center Construction market to help players in achieving a strong market position. Buyers of the report can access verified and reliable market forecasts, including those for the overall size of the global Data Center Construction market in terms of revenue.
Players, stakeholders, and other participants in the global Data Center Construction market will be able to gain the upper hand as they use the report as a powerful resource. For this version of the report, the segmental analysis focuses on revenue and forecast by each application segment in terms of revenue and forecast by each type segment in terms of revenue for the period 2015-2026.
Regional and Country-level Analysis
The report offers an exhaustive geographical analysis of the global Data Center Construction market, covering important regions, viz, North America, Europe, China, Japan, Southeast Asia, India and Central & South America. It also covers key countries (regions), viz, U.S., Canada, Germany, France, U.K., Italy, Russia, China, Japan, South Korea, India, Australia, Taiwan, Indonesia, Thailand, Malaysia, Philippines, Vietnam, Mexico, Brazil, Turkey, Saudi Arabia, UAE, etc.
The report includes country-wise and region-wise market size for the period 2015-2026. It also includes market size and forecast by each application segment in terms of revenue for the period 2015-2026.
Competition Analysis
In the competitive analysis section of the report, leading as well as prominent players of the global Data Center Construction market are broadly studied on the basis of key factors. The report offers comprehensive analysis and accurate statistics on revenue by the player for the period 2015-2020. It also offers detailed analysis supported by reliable statistics on price and revenue (global level) by player for the period 2015-2020.
On the whole, the report proves to be an effective tool that players can use to gain a competitive edge over their competitors and ensure lasting success in the global Data Center Construction market. All of the findings, data, and information provided in the report are validated and revalidated with the help of trustworthy sources. The analysts who have authored the report took a unique and industry-best research and analysis approach for an in-depth study of the global Data Center Construction market.
The following players are covered in this report:
Aceco TI
AECOM
Turner Construction
Equinix
Fluor
DPR Construction
Constructora Sudamericana S.A.
...
Data Center Construction Breakdown Data by Type
Electrical Construction
Mechanical Construction
General Construction
Data Center Construction Breakdown Data by Application
Finance
Internet
Telecommunications
Government
Others
1 Report Overview
1.1 Study Scope
1.2 Key Market Segments
1.3 Players Covered: Ranking by Data Center Construction Revenue
1.4 Market Analysis by Type
1.4.1 Global Data Center Construction Market Size Growth Rate by Type: 2020 VS 2026
1.4.2 Electrical Construction
1.4.3 Mechanical Construction
1.4.4 General Construction
1.5 Market by Application
1.5.1 Global Data Center Construction Market Share by Application: 2020 VS 2026
1.5.2 Finance
1.5.3 Internet
1.5.4 Telecommunications
1.5.5 Government
1.5.6 Others
1.6 Coronavirus Disease 2019 (Covid-19): Data Center Construction Industry Impact
1.6.1 How the Covid-19 is Affecting the Data Center Construction Industry
1.6.1.1 Data Center Construction Business Impact Assessment - Covid-19
1.6.1.2 Supply Chain Challenges
1.6.1.3 COVID-19s Impact On Crude Oil and Refined Products
1.6.2 Market Trends and Data Center Construction Potential Opportunities in the COVID-19 Landscape
1.6.3 Measures / Proposal against Covid-19
1.6.3.1 Government Measures to Combat Covid-19 Impact
1.6.3.2 Proposal for Data Center Construction Players to Combat Covid-19 Impact
1.7 Study Objectives
1.8 Years Considered

2 Global Growth Trends by Regions
2.1 Data Center Construction Market Perspective (2015-2026)
2.2 Data Center Construction Growth Trends by Regions
2.2.1 Data Center Construction Market Size by Regions: 2015 VS 2020 VS 2026
2.2.2 Data Center Construction Historic Market Share by Regions (2015-2020)
2.2.3 Data Center Construction Forecasted Market Size by Regions (2021-2026)
2.3 Industry Trends and Growth Strategy
2.3.1 Market Top Trends
2.3.2 Market Drivers
2.3.3 Market Challenges
2.3.4 Porters Five Forces Analysis
2.3.5 Data Center Construction Market Growth Strategy
2.3.6 Primary Interviews with Key Data Center Construction Players (Opinion Leaders)

3 Competition Landscape by Key Players
3.1 Global Top Data Center Construction Players by Market Size
3.1.1 Global Top Data Center Construction Players by Revenue (2015-2020)
3.1.2 Global Data Center Construction Revenue Market Share by Players (2015-2020)
3.1.3 Global Data Center Construction Market Share by Company Type (Tier 1, Tier 2 and Tier 3)
3.2 Global Data Center Construction Market Concentration Ratio
3.2.1 Global Data Center Construction Market Concentration Ratio (CR5 and HHI)
3.2.2 Global Top 10 and Top 5 Companies by Data Center Construction Revenue in 2019
3.3 Data Center Construction Key Players Head office and Area Served
3.4 Key Players Data Center Construction Product Solution and Service
3.5 Date of Enter into Data Center Construction Market
3.6 Mergers & Acquisitions, Expansion Plans

4 Breakdown Data by Type (2015-2026)
4.1 Global Data Center Construction Historic Market Size by Type (2015-2020)
4.2 Global Data Center Construction Forecasted Market Size by Type (2021-2026)

5 Data Center Construction Breakdown Data by Application (2015-2026)
5.1 Global Data Center Construction Market Size by Application (2015-2020)
5.2 Global Data Center Construction Forecasted Market Size by Application (2021-2026)

6 North America
6.1 North America Data Center Construction Market Size (2015-2020)
6.2 Data Center Construction Key Players in North America (2019-2020)
6.3 North America Data Center Construction Market Size by Type (2015-2020)
6.4 North America Data Center Construction Market Size by Application (2015-2020)

7 Europe
7.1 Europe Data Center Construction Market Size (2015-2020)
7.2 Data Center Construction Key Players in Europe (2019-2020)
7.3 Europe Data Center Construction Market Size by Type (2015-2020)
7.4 Europe Data Center Construction Market Size by Application (2015-2020)

8 China
8.1 China Data Center Construction Market Size (2015-2020)
8.2 Data Center Construction Key Players in China (2019-2020)
8.3 China Data Center Construction Market Size by Type (2015-2020)
8.4 China Data Center Construction Market Size by Application (2015-2020)

9 Japan
9.1 Japan Data Center Construction Market Size (2015-2020)
9.2 Data Center Construction Key Players in Japan (2019-2020)
9.3 Japan Data Center Construction Market Size by Type (2015-2020)
9.4 Japan Data Center Construction Market Size by Application (2015-2020)

10 Southeast Asia
10.1 Southeast Asia Data Center Construction Market Size (2015-2020)
10.2 Data Center Construction Key Players in Southeast Asia (2019-2020)
10.3 Southeast Asia Data Center Construction Market Size by Type (2015-2020)
10.4 Southeast Asia Data Center Construction Market Size by Application (2015-2020)

11 India
11.1 India Data Center Construction Market Size (2015-2020)
11.2 Data Center Construction Key Players in India (2019-2020)
11.3 India Data Center Construction Market Size by Type (2015-2020)
11.4 India Data Center Construction Market Size by Application (2015-2020)

12 Central & South America
12.1 Central & South America Data Center Construction Market Size (2015-2020)
12.2 Data Center Construction Key Players in Central & South America (2019-2020)
12.3 Central & South America Data Center Construction Market Size by Type (2015-2020)
12.4 Central & South America Data Center Construction Market Size by Application (2015-2020)

13 Key Players Profiles
13.1 Aceco TI
13.1.1 Aceco TI Company Details
13.1.2 Aceco TI Business Overview and Its Total Revenue
13.1.3 Aceco TI Data Center Construction Introduction
13.1.4 Aceco TI Revenue in Data Center Construction Business (2015-2020))
13.1.5 Aceco TI Recent Development
13.2 AECOM
13.2.1 AECOM Company Details
13.2.2 AECOM Business Overview and Its Total Revenue
13.2.3 AECOM Data Center Construction Introduction
13.2.4 AECOM Revenue in Data Center Construction Business (2015-2020)
13.2.5 AECOM Recent Development
13.3 Turner Construction
13.3.1 Turner Construction Company Details
13.3.2 Turner Construction Business Overview and Its Total Revenue
13.3.3 Turner Construction Data Center Construction Introduction
13.3.4 Turner Construction Revenue in Data Center Construction Business (2015-2020)
13.3.5 Turner Construction Recent Development
13.4 Equinix
13.4.1 Equinix Company Details
13.4.2 Equinix Business Overview and Its Total Revenue
13.4.3 Equinix Data Center Construction Introduction
13.4.4 Equinix Revenue in Data Center Construction Business (2015-2020)
13.4.5 Equinix Recent Development
13.5 Fluor
13.5.1 Fluor Company Details
13.5.2 Fluor Business Overview and Its Total Revenue
13.5.3 Fluor Data Center Construction Introduction
13.5.4 Fluor Revenue in Data Center Construction Business (2015-2020)
13.5.5 Fluor Recent Development
13.6 DPR Construction
13.6.1 DPR Construction Company Details
13.6.2 DPR Construction Business Overview and Its Total Revenue
13.6.3 DPR Construction Data Center Construction Introduction
13.6.4 DPR Construction Revenue in Data Center Construction Business (2015-2020)
13.6.5 DPR Construction Recent Development
13.7 Constructora Sudamericana S.A.
13.7.1 Constructora Sudamericana S.A. Company Details
13.7.2 Constructora Sudamericana S.A. Business Overview and Its Total Revenue
13.7.3 Constructora Sudamericana S.A. Data Center Construction Introduction
13.7.4 Constructora Sudamericana S.A. Revenue in Data Center Construction Business (2015-2020)
13.7.5 Constructora Sudamericana S.A. Recent Development

14 Analyst's Viewpoints/Conclusions

15 Appendix
15.1 Research Methodology
15.1.1 Methodology/Research Approach
15.1.2 Data Source
15.2 Disclaimer
15.3 Author Details

List of Table

List of Tables
Table 1. Data Center Construction Key Market Segments
Table 2. Key Players Covered: Ranking by Data Center Construction Revenue
Table 3. Ranking of Global Top Data Center Construction Manufacturers by Revenue (US$ Million) in 2019
Table 4. Global Data Center Construction Market Size Growth Rate by Type (US$ Million): 2020 VS 2026
Table 5. Key Players of Electrical Construction
Table 6. Key Players of Mechanical Construction
Table 7. Key Players of General Construction
Table 8. COVID-19 Impact Global Market: (Four Data Center Construction Market Size Forecast Scenarios)
Table 9. Opportunities and Trends for Data Center Construction Players in the COVID-19 Landscape
Table 10. Present Opportunities in China & Elsewhere Due to the Coronavirus Crisis
Table 11. Key Regions/Countries Measures against Covid-19 Impact
Table 12. Proposal for Data Center Construction Players to Combat Covid-19 Impact
Table 13. Global Data Center Construction Market Size Growth by Application (US$ Million): 2020 VS 2026
Table 14. Global Data Center Construction Market Size by Regions (US$ Million): 2020 VS 2026
Table 15. Global Data Center Construction Market Size by Regions (2015-2020) (US$ Million)
Table 16. Global Data Center Construction Market Share by Regions (2015-2020)
Table 17. Global Data Center Construction Forecasted Market Size by Regions (2021-2026) (US$ Million)
Table 18. Global Data Center Construction Market Share by Regions (2021-2026)
Table 19. Market Top Trends
Table 20. Key Drivers: Impact Analysis
Table 21. Key Challenges
Table 22. Data Center Construction Market Growth Strategy
Table 23. Main Points Interviewed from Key Data Center Construction Players
Table 24. Global Data Center Construction Revenue by Players (2015-2020) (Million US$)
Table 25. Global Data Center Construction Market Share by Players (2015-2020)
Table 26. Global Top Data Center Construction Players by Company Type (Tier 1, Tier 2 and Tier 3) (based on the Revenue in Data Center Construction as of 2019)
Table 27. Global Data Center Construction by Players Market Concentration Ratio (CR5 and HHI)
Table 28. Key Players Headquarters and Area Served
Table 29. Key Players Data Center Construction Product Solution and Service
Table 30. Date of Enter into Data Center Construction Market
Table 31. Mergers & Acquisitions, Expansion Plans
Table 32. Global Data Center Construction Market Size by Type (2015-2020) (Million US$)
Table 33. Global Data Center Construction Market Size Share by Type (2015-2020)
Table 34. Global Data Center Construction Revenue Market Share by Type (2021-2026)
Table 35. Global Data Center Construction Market Size Share by Application (2015-2020)
Table 36. Global Data Center Construction Market Size by Application (2015-2020) (Million US$)
Table 37. Global Data Center Construction Market Size Share by Application (2021-2026)
Table 38. North America Key Players Data Center Construction Revenue (2019-2020) (Million US$)
Table 39. North America Key Players Data Center Construction Market Share (2019-2020)
Table 40. North America Data Center Construction Market Size by Type (2015-2020) (Million US$)
Table 41. North America Data Center Construction Market Share by Type (2015-2020)
Table 42. North America Data Center Construction Market Size by Application (2015-2020) (Million US$)
Table 43. North America Data Center Construction Market Share by Application (2015-2020)
Table 44. Europe Key Players Data Center Construction Revenue (2019-2020) (Million US$)
Table 45. Europe Key Players Data Center Construction Market Share (2019-2020)
Table 46. Europe Data Center Construction Market Size by Type (2015-2020) (Million US$)
Table 47. Europe Data Center Construction Market Share by Type (2015-2020)
Table 48. Europe Data Center Construction Market Size by Application (2015-2020) (Million US$)
Table 49. Europe Data Center Construction Market Share by Application (2015-2020)
Table 50. China Key Players Data Center Construction Revenue (2019-2020) (Million US$)
Table 51. China Key Players Data Center Construction Market Share (2019-2020)
Table 52. China Data Center Construction Market Size by Type (2015-2020) (Million US$)
Table 53. China Data Center Construction Market Share by Type (2015-2020)
Table 54. China Data Center Construction Market Size by Application (2015-2020) (Million US$)
Table 55. China Data Center Construction Market Share by Application (2015-2020)
Table 56. Japan Key Players Data Center Construction Revenue (2019-2020) (Million US$)
Table 57. Japan Key Players Data Center Construction Market Share (2019-2020)
Table 58. Japan Data Center Construction Market Size by Type (2015-2020) (Million US$)
Table 59. Japan Data Center Construction Market Share by Type (2015-2020)
Table 60. Japan Data Center Construction Market Size by Application (2015-2020) (Million US$)
Table 61. Japan Data Center Construction Market Share by Application (2015-2020)
Table 62. Southeast Asia Key Players Data Center Construction Revenue (2019-2020) (Million US$)
Table 63. Southeast Asia Key Players Data Center Construction Market Share (2019-2020)
Table 64. Southeast Asia Data Center Construction Market Size by Type (2015-2020) (Million US$)
Table 65. Southeast Asia Data Center Construction Market Share by Type (2015-2020)
Table 66. Southeast Asia Data Center Construction Market Size by Application (2015-2020) (Million US$)
Table 67. Southeast Asia Data Center Construction Market Share by Application (2015-2020)
Table 68. India Key Players Data Center Construction Revenue (2019-2020) (Million US$)
Table 69. India Key Players Data Center Construction Market Share (2019-2020)
Table 70. India Data Center Construction Market Size by Type (2015-2020) (Million US$)
Table 71. India Data Center Construction Market Share by Type (2015-2020)
Table 72. India Data Center Construction Market Size by Application (2015-2020) (Million US$)
Table 73. India Data Center Construction Market Share by Application (2015-2020)
Table 74. Central & South America Key Players Data Center Construction Revenue (2019-2020) (Million US$)
Table 75. Central & South America Key Players Data Center Construction Market Share (2019-2020)
Table 76. Central & South America Data Center Construction Market Size by Type (2015-2020) (Million US$)
Table 77. Central & South America Data Center Construction Market Share by Type (2015-2020)
Table 78. Central & South America Data Center Construction Market Size by Application (2015-2020) (Million US$)
Table 79. Central & South America Data Center Construction Market Share by Application (2015-2020)
Table 80. Aceco TI Company Details
Table 81. Aceco TI Business Overview
Table 82. Aceco TI Product
Table 83. Aceco TI Revenue in Data Center Construction Business (2015-2020) (Million US$)
Table 84. Aceco TI Recent Development
Table 85. AECOM Company Details
Table 86. AECOM Business Overview
Table 87. AECOM Product
Table 88. AECOM Revenue in Data Center Construction Business (2015-2020) (Million US$)
Table 89. AECOM Recent Development
Table 90. Turner Construction Company Details
Table 91. Turner Construction Business Overview
Table 92. Turner Construction Product
Table 93. Turner Construction Revenue in Data Center Construction Business (2015-2020) (Million US$)
Table 94. Turner Construction Recent Development
Table 95. Equinix Company Details
Table 96. Equinix Business Overview
Table 97. Equinix Product
Table 98. Equinix Revenue in Data Center Construction Business (2015-2020) (Million US$)
Table 99. Equinix Recent Development
Table 100. Fluor Company Details
Table 101. Fluor Business Overview
Table 102. Fluor Product
Table 103. Fluor Revenue in Data Center Construction Business (2015-2020) (Million US$)
Table 104. Fluor Recent Development
Table 105. DPR Construction Company Details
Table 106. DPR Construction Business Overview
Table 107. DPR Construction Product
Table 108. DPR Construction Revenue in Data Center Construction Business (2015-2020) (Million US$)
Table 109. DPR Construction Recent Development
Table 110. Constructora Sudamericana S.A. Company Details
Table 111. Constructora Sudamericana S.A. Business Overview
Table 112. Constructora Sudamericana S.A. Product
Table 113. Constructora Sudamericana S.A. Revenue in Data Center Construction Business (2015-2020) (Million US$)
Table 114. Constructora Sudamericana S.A. Recent Development
Table 115. Research Programs/Design for This Report
Table 116. Key Data Information from Secondary Sources
Table 117. Key Data Information from Primary Sources
List of Figures
Figure 1. Global Data Center Construction Market Share by Type: 2020 VS 2026
Figure 2. Electrical Construction Features
Figure 3. Mechanical Construction Features
Figure 4. General Construction Features
Figure 5. Global Data Center Construction Market Share by Application: 2020 VS 2026
Figure 6. Finance Case Studies
Figure 7. Internet Case Studies
Figure 8. Telecommunications Case Studies
Figure 9. Government Case Studies
Figure 10. Others Case Studies
Figure 11. Data Center Construction Report Years Considered
Figure 12. Global Data Center Construction Market Size YoY Growth 2015-2026 (US$ Million)
Figure 13. Global Data Center Construction Market Share by Regions: 2020 VS 2026
Figure 14. Global Data Center Construction Market Share by Regions (2021-2026)
Figure 15. Porter's Five Forces Analysis
Figure 16. Global Data Center Construction Market Share by Players in 2019
Figure 17. Global Top Data Center Construction Players by Company Type (Tier 1, Tier 2 and Tier 3) (based on the Revenue in Data Center Construction as of 2019
Figure 18. The Top 10 and 5 Players Market Share by Data Center Construction Revenue in 2019
Figure 19. North America Data Center Construction Market Size YoY Growth (2015-2020) (Million US$)
Figure 20. Europe Data Center Construction Market Size YoY Growth (2015-2020) (Million US$)
Figure 21. China Data Center Construction Market Size YoY Growth (2015-2020) (Million US$)
Figure 22. Japan Data Center Construction Market Size YoY Growth (2015-2020) (Million US$)
Figure 23. Southeast Asia Data Center Construction Market Size YoY Growth (2015-2020) (Million US$)
Figure 24. India Data Center Construction Market Size YoY Growth (2015-2020) (Million US$)
Figure 25. Central & South America Data Center Construction Market Size YoY Growth (2015-2020) (Million US$)
Figure 26. Aceco TI Total Revenue (US$ Million): 2019 Compared with 2018
Figure 27. Aceco TI Revenue Growth Rate in Data Center Construction Business (2015-2020)
Figure 28. AECOM Total Revenue (US$ Million): 2019 Compared with 2018
Figure 29. AECOM Revenue Growth Rate in Data Center Construction Business (2015-2020)
Figure 30. Turner Construction Total Revenue (US$ Million): 2019 Compared with 2018
Figure 31. Turner Construction Revenue Growth Rate in Data Center Construction Business (2015-2020)
Figure 32. Equinix Total Revenue (US$ Million): 2019 Compared with 2018
Figure 33. Equinix Revenue Growth Rate in Data Center Construction Business (2015-2020)
Figure 34. Fluor Total Revenue (US$ Million): 2019 Compared with 2018
Figure 35. Fluor Revenue Growth Rate in Data Center Construction Business (2015-2020)
Figure 36. DPR Construction Total Revenue (US$ Million): 2019 Compared with 2018
Figure 37. DPR Construction Revenue Growth Rate in Data Center Construction Business (2015-2020)
Figure 38. Constructora Sudamericana S.A. Total Revenue (US$ Million): 2019 Compared with 2018
Figure 39. Constructora Sudamericana S.A. Revenue Growth Rate in Data Center Construction Business (2015-2020)
Figure 40. Bottom-up and Top-down Approaches for This Report
Figure 41. Data Triangulation
Figure 42. Key Executives Interviewed

Ask for discount before buying this report

Please fill the enquiry form below.

  • Full Name *
  • Your Email *
  • Job Title
  • Company *
  • Phone No. * (Pls. Affix Country Code)
  • Country :
  • Your Requirement
  • Security Code *
* denotes fields which must be completed

Buy This Report


Select License Type :

$ 3900
$ 5850

Do you wish to check sample of this report?

Have Query?


Research Assistance

For Enquiries, Call :

+1-800-998-4852US Toll Free

Email : sales@marketresearchhub.com

Back To Top